Managerial skill , Analytical Skill, Ms Word,Ms Excel,Primevera (P6), Auto CAD 2016 2D
Graduate
26 Years
India
Male
2-5 year
Work Visa with NOC
Musherib, Doha, Qatar
No
Managerial skill , Analytical Skill, Ms Word,Ms Excel,Primevera (P6), Auto CAD 2016 2D
OBJECTIVE:
Dynamic hard working professional around 4+ years’ experience in Electrical
11KV Works, MEP works with proficiency in PLC SCADA. I aspire for a challenging position in a professional organization where I can enhance my skills and streghtenthem in conjunction with organization goals.
PROFILE SUMMARY:
? Focused and Resourceful Electrical Engineer with exceptional team
leadership and Quality assurance abilities.
? Good Understanding 11 KV and Distribution Substation Projects.
? Meticulous Attention to details with regards to KAHARMAA Rules &
regulation and Practices and Distribution Networks.
? Have a Good Knowledge about Power and Distribution Transformer.
? Excellent Creative thinking skills and manual dexterity.
? Ability to identify and solve complex technical problems.
CURRENT EXPERIENCE:
Worked as ELECTRICAL ENGINEER in BIN AL Sheikh Holding, Since April 2019 to Till Date.
Roles & Responsibilities:
PROFESSIONAL EXPERIENCE:
Worked as ELECTRICAL ENGINEER in The Best Trading & Contracting, Qatar, Since August 2018 to February 2019.
THE BEST Trading & Contracting is Licensed Grade A MEP Company; & also approved by KAHRAMAA Construction Department.
Responsibilities:
? Prepare KM documents to get KM approval as self-work contractor
? Prepare material submittals for equipment’s & cables
? Prepare materials take off and follow up with materials delivery to
Make sure it is complying with the approval.
? Prepare the site for installation: give guidance to the jointer and fitters
And make sure that they are following KM procedure and Standard.
? Prepare for materials inspection to obtain final KM approval.
? To attend Switchgear fitting inspection with KM Inspector.
? Request to Perform KM Trench inspection; supervise cable laying as per
KM Standard
? To prepare meggar testing report after cable laying and after
Back filling to insure cable insulation are good condition.
? For testing of cable by VLF TEST.
? Prepare the site for fitting Inspection.
? To attend Substation Handing Over with KM inspector.
? Prepare the documents for final materials approval by KM inspector.
? Follow up daily site activities report to project manager.
? Attend Programme for KM energization by doing Hi Pot test ( VLF Test)
? To arrange Hot work permit to Jointers.
? PTW, LOA, Tag In, Tag out, Padlock system, Hot Work Permit for safety
formalities for all kind of Electrical Work.
? Pre-Testing of switchgear panel, Bus Bar, Before KM fitting inspection.
? Preparing Project Estimation, reviewing the electrical equipment
quotation.
? Trouble shooting solve problems in LV
? Prepare daily, Weekly, Monthly Report of The project
PROJECT : Zulal Destination SPA AND FIVE STAR FAMILY RESORT RUWAIS
Client : Pioneer Trading & Contracting Wll. Location : Al Ruwais
Responsibility :
? 33/11 KV transformer ,11 kv feeder panel installation
? HV,LV,CONTROL CABLES laying and Termination
? 15 Nos 3CX240 Straight joint Termination ,3CX70 End Termination
? Trench Excavation,Back filling the trench ,cable tiles ,warning tape as
per KM standard.
? 4 Nos of 65 V Battery and Battery Charger installation.
? To Check Proper connection of control cable 4Cx4Sq.mm and Earthing
cable in battery carger.
? To Check Pilot Cable by Meggar Test and IR Test before connection in
Marshalling Box and MV Panel.
? To do Meggar Test and HIPOT test After laying the 11 kv cable and
Before Connection and submit Report to Client.
? To coordinate with Client for preparing of AS built drawing.
? Participate with KM Inspector For fitting inspection of switchgear panel
and coordinate with Switchgear panel supplier and TX supplier and
prepare documents for KM Signature.
? Coordinate with KM protection Engineer of I/D SS.
? Participate In Energization of SS With Commissioning Engr. For
confirmation of core colour from Primary SS.
? Filling correct information on SS Data Card with Details of serial NO
panel ,TX ,Customer panel and take sign of commissioning signatur.
PROJECT: ALI BIN ALI WAREHOUSEING & LOGISTICS PARK CLIENT : Metrix Qatar.W.L.L
Location : UMM SHAHRAIN Responsibility:
? 66/11 KV transformer ,11 kv feeder panel installation
? HV,LV,CONTROL CABLES laying and Termination
? 35 Nos 3CX240 Sq.mm Straight joint Termination ,20 Nos of 3CX70
Sq.mm End Termination
? Trench Excavation,Back filling the trench ,cable tiles ,warning tape as
per KM standard.
? 10 Nos of 30 V Battery and Battery Charger installation.
? To Check Proper connection of control cable 4Cx4Sq.mm and Earthing
cable in battery charger.
? To Check Pilot Cable by Meggar Test and IR Test before connection in
Marshalling Box and MV Panel.
? To do Meggar Test and HIPOT test After laying the 11 kv cable and
Before Connection and submit Report to Client.
? To coordinate with Client for preparing of ASbuilt drawing.
? Participate with KM Inspector For fitting inspection of switchgear panel
and coordinate with Switchgear panel supplier and TX supplier and
prepare documents for KM Signature.
? Coordinate with KM protection Engineer of I/D SS.
? Participate In Energization of SS With Commissioning Engr. For
confirmation of core colour from Primary SS.
? Filling correct information on SS Data Card with Details of serial NO
panel ,TX ,Customer panel and take sign of commissioning signature.
PROJECT: SUPPLY TO INFRASTRUCTURE DEVELOPMENT AT LUSSAIL-ENERGY CITY -1
CLIENT: CONSOLIDATED GULF CO (CGC) LOCATION : Lussail City Qatar
Responsibility :
? To attend materials Inspection Of 41 Nos TX (ONAN ) with KM Inspector
and get Approval
? To attend Materials Inspection of Switchgear panel with KM Inspector
and get for Approval
? To get KM Approval of Cable trench Inspection By KM Inspector.
? To Prepare Meggar Report OF 3CX 300 Sqmm Cable to submit to
Client.
PROJECT: CABLE LAYING AND TERMINATION OF AL BAYT STADIUM CLIENT: LEONARDO
LOCATION: AL KHOR Responsibilities:
? Coordinate to Site Engineer for readiness of cable tray as per drawing
? Cable laying (4CX240, 4CX185, 4CX70, 4CX400, 1CX35, 1CX95)Sq.mm
for supervising and monitoring.
? Submit Cable laying Progress Report to Client on daily basis.
? Proper Dressing of cable using cable tie.
? Prepare Meggar Report and Submit to Client for Cable Laying
Inspection.
? Follow The payment after inspection successfully completed.
PREVIOUS EXPERIENCE:
BMS ENGINEER: in Maxon Engineering Group, Qatar (August 2017- July
2018
Worked as TRAINEE at Houbara Breeding Station at Rawadat Al Faras, Qatar
(Undertaken by the Ministry of Municipality and Environment, Qatar)
? BMS Point Configuration, cable assignments (Beldons) & termination, testing & commissioning the system.
? ALERTON controls are used VLC 16160-1600-853-651R.
? Inspection with Client.
? Installation and Proper wiring connection of relay
? Communication Loop Testing for VAV, FCU & DDCP.
? Field Device is used Honeywell Sensors and Actuators.
? Preparing the I/O points list according to the requirement of the
Project specification.
? Installation of all field devices.
? Supervision of Belden Cable pulling as per drawing.
? Install and maintain medium and low voltage switchgear and
control systems.
? Installation, testing, Commissioning of electrical installation in multi-
storied Building.
? Purchase the trading equipment is for piping, wiring & all -purpose
of the project.
? Preparing work report for weekly and daily basis .
? Supervision of the Field devices like Pressure, Flow, Temperature,
Differential Pressure Transmitter etc.
? Cable Wiring & pulling as per layout.
PROFESSIONAL EXPERIENCE: in INDIA
Have 2 years of Experience in the field of Electrical Projects.
Project Engineer in Bhartiya Caccialanza Fire System LTD
ROLES AND RESPONSIBLITIES
? Estimation & Costing during bidding phase of Project.
? Responsible for all Engineering drawing approval of
Concern project.
? engaged in the approval of technical documents from clients
After allotment of project.
? Preparation of BOQ/BOM and BBUP.
? Co-ordination with vendors for material supply.
? Responsible for inspection of material as per approved m
specification by Client.
? To get CIPs’ of material after Inspection.
? Project co-ordination with clients and site in charge.
? Capable of handling work pressure.
? Responsible for the execution of Project within given time frame.
SCOPE OF WORK:
Supply , Execution and Testing & Commissioning of Transformer, PCC Panel, ELV Panel, Capacitor Bank, Distribution Boards, Earthling system, Sub Distribution Boards, LT Cabling, Lighting and Power System and Low Voltage
System- Fire Alarm System.
Bachelor of Technology (Electrical& ELECTRONICS Engineering), UTTAR PRADESH TECHNICAL UNIVERSITY, LUCKNOW
UPTU, LUCKNOW, 2011-2015, Marks attained: 64.43%
PROFESSIONAL TRAINING:
INDIAN OIL CORPORATION LIMITED.
BEGUSARAI, BIHAR, India
Scope of Training
To learn how to generates Electricity by steam.
Worked on project about the Electricity generates by steam in IOCL. Documented project progress and submitted reports to
management.
CERTIFICATIONS:
? PRIMAVERA -P6 (Project Management Planning)
? Auto CAD 2D 2015
? E TAP (Electrical Transient Analysis Programme.
? Design of Fire Safety in Substation, Cable trench and other parts of
electrical system.
Operating Systems : Windows XP, Windows7/8/10.
? Software Packages : MS-Office 2007/2010/2013, Web Browsers,
? MS Office (MS Word, Excel, Power Point )
EXTRA CURRICULAR ACTIVITIES:
• Presented a seminar on Electric Hazards.
• Served as member of Dramatic Society in SDEC, GZB
• Functioned as the Organizing Member in Fiesta-2012 in College.
PASSPORT DETAILS:
|
Passport NO |
Date of Issue |
Date of Expiry |
Place of issue |
N8845124 |
11/03/2016 |
10/03/2026 |
Patna |
|
|
||||
PERSONAL DETAILS: |
Date of Birth |
07th September, 1993 |
Languages known: |
English, Hindi, Urdu |
Nationality: |
Indian |
Marital Status: |
Single |
Father’s Name: |
Mr. Syed Jawaid Hassan |
|
|
DATE: SYED ZAMEER HASSAN PLACE: QATAR
Electrical And Electronics Engineering , 5-07-2011-29-05-2015
A.P.J Abdul Kalam Technical University
Percentage :63.44
Bin Al Sheikh Holding
2019-05-04 to 2019-03-09
Post Graduate 20-25 Years No Visa
I am an experienced executive and strategi...
View ProfilePost Graduate 10-15 Years Work Visa with NOC
I enjoy innovation and love to experiment ...
View ProfileDiploma 5-10 year Work Visa Transferable
Highly analytical and performance-driven p...
View Profile